Review a production journey from plan to closeout
Follow one production order across materials, operations, quality, stock and costs without mixing unrelated records.
In this lesson
Review a production journey from plan to closeout
Before you begin
Choose one production order to review. Keep its reference, exact product and quantity with you throughout these checks. Related records must belong to that order—not simply look similar.
Follow the same order
1. Open Produce → Products, BOMs and Routings. Match the product, stock unit, output batch and effective manufacturing versions. A newer Draft BOM is not automatically the version to use. 2. Open the exact Production Order. Compare required materials with available eligible supply, reservations, issues and consumption. Investigate any shortage before release; stock for another item or a quarantined quantity is not a substitute. 3. Check the planned operations and Work Centres. Confirm the needed people, equipment and actual available time with the team. Daily capacity alone is not a booked production slot. 4. Review the order's operations in Shop Floor. Compare completed quantity, active time, downtime and material records. Do not treat a completed operation as proof that every planned unit was produced. 5. Follow output into Quality and the exact Inventory item or lot. Match the source order, inspection quantity, recorded findings and final result. Check storage and eligibility separately; an inspection awaiting a decision is not a release. 6. If correction is needed, use the rework preparation workflow from the earlier lesson. Keep the original defect, affected quantity and required checks linked. Record only work and inspection actually performed. 7. If this order uses Subcontracting, follow its own supplier order into the matching receipt and putaway. Reconcile material responsibility, sent/received quantities, acceptance and any supplier-held remainder. Do not merge another supplier order into this journey. 8. Finish in Costing and Reports. Compare the exact order's expected and actual costs, remaining output and completion requirements. Finance postings must be confirmed in Finance, not inferred from Costing.
Check the result
You should be able to trace one consistent chain from product definition to its latest stock and cost position. For each remaining item, name the owner and next action—for example, obtain missing material, complete a final inspection or resolve a cost difference. Leave the order at its truthful current stage rather than changing settings or quantities just to make it appear complete.
Work a bounded production handoff
Worked review: not yet complete
This condensed Ternwick example comes from the original course's fictional paper case, not a Workroomly order or a performed practical. Do not enter these references or quantities into the app.
At the 28 October 10:30 case cutoff, TRN-JOB-8 plans 8 sets for demand TRN-DMD-11 after 3 eligible opening sets. Its approved batch recipe requires 3 cards and 1 sleeve per set.
| Checkpoint | Supplied case evidence | Customer decision |
|---|---|---|
| Materials | 25 cards issued = 24 incorporated + 1 lost; 8 sleeves issued and incorporated | Issue and consumption describe the same inputs; do not deduct both again. |
| Operations and output | Both operations processed 8; good output 7, unreceived process scrap 1 | Two operation counts are not 16 finished sets. |
| Final quality and storage | 6 new sets passed and were put away; TRN-OUT-B holds 1 new set | Good output is not all eligible stock. The held set is not released. |
| Demand | 3 opening eligible + 6 new eligible = 9 against demand 11 | The eligible-demand gap is 2, not the order's output remainder alone. |
| Cost review | Simplified paper expected NGN 218; actual NGN 233; variance +NGN 15 | Analytical comparison only; no Inventory valuation or Finance posting is proved. |
Prepared handoff: “TRN-JOB-8 is not supported as complete. Elin owns review of the recorded resource overrun and any new work; Fara owns the held set's quality decision; Bram owns eligible inputs; Kian owns the revised feasible plan; Sela owns the demand decision. No repair, replacement, delivery or closure is supplied.” This is a prepared note, not a sent message.
For your actual review, replace the case references with independently opened records. Retain module and record type → exact reference/version → unit and cutoff → observed quantity/state → unresolved evidence → owner and next check. Use the material reconciliation and final-quality procedures for those checkpoints; never fill missing stages from a different example.
Continue learning
Continue learning
In this series: Plan and record production — guide 9 of 9.
Turn what you learned into the way the team works.
Mark this lesson complete once the workflow exists in your workspace—not simply when you reach the bottom.