Create a purchase request for approval

Workroomly Editorial
Begin the lesson ↓

Share this resource

Copy the link to share this page with your team.

Describe the need, save a correct draft and follow its internal review into procurement intake.

In this lesson

Create a purchase request for approval

Describe the need, save a correct draft and follow its internal review into procurement intake.

Before you start

Have the specification, quantity and unit, estimated price, department, need-by date and delivery location. Check the budget basis and expected reviewer. Search existing requests first. If the intended request exists, skip steps 1–6: use step 7 only for a ready draft; otherwise inspect its current outcome at step 9 without resubmitting an already reviewed request.

Save a clear request

1. Open Procure → Requests → Requests → New to open New Purchase Request.

2. Enter Request title, Department and Business purpose. Set the actual Need by date, Delivery / service location and Priority. A Preferred supplier is only a preference for review, not an award.

3. In Requested items, enter Description, choose Type as Goods or Service, and set Quantity, Unit and Estimated unit price. Use Catalog item only when it is the correct available source. Select relevant Category, Project and Budget allocation where applicable.

4. Check the arithmetic and unit basis. Six individual items at 4 each total 24; six packs at 4 per pack describe something different. Check the displayed currency rather than assuming conversion. For services, describe the deliverable and how it will be accepted.

5. Use Add item for another requirement and Supporting documents for relevant material. Review every line before continuing.

Submit for approval now is ON in this untouched form. Its helper says to turn it off to save an editable draft. Review that switch before saving; this image does not show the OFF state, the Save draft action or a saved request.
Submit for approval now is ON in this untouched form. Its helper says to turn it off to save an editable draft. Review that switch before saving; this image does not show the OFF state, the Save draft action or a saved request.

Save and reopen the exact draft

6. Turn Submit for approval now off to prepare a draft and confirm the action changes to Save draft. Select it once, return to Requests and reopen the saved reference. Check the full header, items, quantities, prices and draft state.

This existing fictional PR-000005 is retained as not submitted, with Fulfilment not ready. Match the reference, items and approval state when reopening your draft; this sample was inspected without submitting it.
This existing fictional PR-000005 is retained as not submitted, with Fulfilment not ready. Match the reference, items and approval state when reopening your draft; this sample was inspected without submitting it.

Review the separate resubmission switch

For a correction, open Edit and review Resubmit for approval after saving before Save changes. Leave this switch off to keep the request as a draft, as its helper states. Reopen the same reference after saving and verify the retained approval state; do not assume that saving a correction submitted it for approval.

Existing Edit: Resubmit for approval after saving is off. The helper says leaving it off keeps the request as a draft. Save changes and resubmission are separate decisions; no save or submission was performed for this capture.
Existing Edit: Resubmit for approval after saving is off. The helper says leaving it off keeps the request as a draft. Save changes and resubmission are separate decisions; no save or submission was performed for this capture.

Submit when ready and follow the decision

Submit and follow the decision

7. When the request is ready, reopen that exact draft and use its submit action. Read Approval journey to see the assigned review stage.

8. The assigned reviewer opens Approvals → My Queue, selects the same request and checks the need, budget and intended next activity. For approval, select Approve, enter precise Decision comments, add decision evidence if needed, then confirm Approve. Return for changes and Reject are separate decisions for the appropriate situation.

9. Return to Requests and reopen the record. Check Approval, Fulfilment and the retained decision. If it is approved and waiting in intake, arrange the procurement owner and next sourcing step.

Expected result

The saved request explains exactly what is needed, and its review status and next responsibility are clear.

Remember: Approval does not mean an order was issued, goods arrived or a bill was paid. If the need changes after approval, use the supported change and review process rather than silently changing the basis of the earlier decision.

Continue learning

In this series: Manage purchasing — guide 6 of 17.

Turn what you learned into the way the team works.

Mark this lesson complete once the workflow exists in your workspace—not simply when you reach the bottom.