Prepare a report for the right audience
Give each reader the information they need without sharing unnecessary detail.
In this lesson
Prepare a report for the right audience
A correct report can still contain too much information for its audience. Decide what the reader needs to do with it before sharing a report or a copy.
Before you start: Identify the report owner, exact recipient accounts and the approved sharing route. This guide combines an audience-readiness checklist with observed staging BI space roles, report publication and a checked CSV export. Confirm the controls and access in your own environment. If you cannot establish which people will gain access, stop before publishing or sharing real report data and have the owner resolve the route.
Choose the useful level of detail
1. Identify the audience and their decision. An operational coordinator may need item-level exceptions; a sponsor may need totals and a short risk summary. An external participant may need only their own instructions.
2. Include the report’s scope, source version and as-of time. Keep the counts behind percentages and explain any important limits.
3. Remove fields the reader does not need. Raw event history, personal details and unrelated records are not automatically useful just because they are available.
Check the sharing route
4. Before using the available publishing or sharing controls, confirm the exact report, intended audience and level of access. A BI space name does not by itself establish privacy.
5. After sharing through the supported route, ask an intended viewer to open the same report or file using their own account. Check that they can see the required content with the intended access.
6. If they cannot open it, resolve the specific account, object or permission issue. Do not make the report public or send the full raw dataset simply to avoid that problem.
Inspect the actual BI space roles
The following controls were observed in the staging Riverside workshop planning space. Open BI → Config and check the selected BI space before reading Access Control. The page provides a workroom-member search and lists current members with their roles. A search result only identifies a member; it does not grant them access. Change a role only when that person needs it for the agreed task.
The displayed role descriptions distinguish these responsibilities:
- Admin: Full access, including deleting the space and promoting someone to Admin.
- Moderator: Manage members and perform Analyst tasks.
- Analyst: Create dashboards, connections, metrics, alerts and reports.
- Member: View dashboards, metrics and alerts only.
Choose access for the reader's actual task, not the most powerful role available. An authoring capability and a viewing capability serve different purposes. This inspection establishes the displayed controls and role descriptions; it did not change membership or demonstrate another account's effective access.

Publish, verify the viewer and check exported copies
Separate Publish from an audience check
In the separately labelled staging practice dashboard Academy BI — Asset lifecycle practice, Save retained the edited report. The subsequent Publish action produced Published revision #1. View published opened that revision in the same Admin session. No audience-selection or confirmation dialog appeared during that Publish action, and no sharing or membership setting was changed.
The published view displayed the expected asset table and a lifecycle chart with one retired and three active assets. That verifies the author's published result. It does not replace step 5: the intended reader must still open the exact report using their own account. A Member role description, a Published badge and an Admin's successful view are three different pieces of evidence.
Before using Publish on your own report, confirm the intended report, existing space access and the content being released. Do not expect Publish to provide a recipient chooser. If you cannot establish the audience, retain the prepared report and resolve the access question with its owner before publishing real or sensitive data.
Check the revision and contents of an export
The published practice report's Export workflow offered PDF, PNG, CSV and Excel formats. Only CSV was generated and checked in this example. On its final action step, the interface stated that exports use the current published revision and exclude unpublished edits. The scope choices were Whole Report, One Page and One Visual.
For the labelled practice export Academy asset lifecycle check, Whole Report included configured data visuals from one visible page. One Generate Now action reached Ready / Generated successfully, and the downloaded CSV contained both the lifecycle result and the source-record section. The chart section contained retired 1 and active 3; the source section contained the same four asset numbers: AST-000002, AST-000003, AST-000001 and AST-000004. Count the records within the relevant section, not every line in a file that also contains titles, headings and another visual's results.
For a real handoff, check the selected scope, published revision and actual file contents before sending a copy. Give the copy an as-of label and explain what its included records cover. No email recipient or schedule was selected for the observed export; the download did not establish an intended recipient's access. Daily, Weekly and Monthly schedule options were visible but were not used; do not infer delivery or refresh behaviour from their labels.
Keep copies understandable
An exported or standalone copy can become out of date. Give it a version and an as-of label. If you correct a report, explain what changed rather than assuming everyone saw the replacement.
Your result is a useful audience-specific report and a checked handoff. A sent link or Published label alone does not prove that the intended person can read it.
The named controls above were observed in staging. Confirm their availability and the effective permissions in your own workroom; the same Admin's published view does not establish an independent Member's access.
Continue learning
In this series: Build useful business reports — guide 6 of 8.
Turn what you learned into the way the team works.
Mark this lesson complete once the workflow exists in your workspace—not simply when you reach the bottom.