CoBrain course 03 — Reviewing proposed actions and verifying effects
An action proposal is a plan for a change, not the change itself. Review its target and consequences before any execution, then verify the actual saved effect independently. The examples below teach you to assess a proposal and verify its outcome; they do not represent a task already created by CoBrain.
Review an action and check its result
A proposed action describes a change; it does not mean that the change has happened. Before letting CoBrain act, check what it will change and where. Afterwards, open the resulting record to confirm it matches your request.
Scope: This chapter teaches a review method. It does not demonstrate a successful CoBrain task-creation action. Available actions depend on what your workroom offers. If a proposal is unavailable, use the normal module workflow when appropriate, keeping any earlier attempted action in mind.
Review the proposal before confirming
- Identify the action. Is it creating a task, editing a record, sending a message or setting up recurring work? Split a mixed proposal into separate decisions.
- Check the destination. Confirm the workroom, Board or other container and the exact record or recipients.
- Read every important field. Compare the title, description, due date, status, priority and responsibility with your request. Read defaults as well as fields you supplied.
- Check the source. Is the proposal based on the correct document version or record? Missing details should remain questions, not plausible guesses.
- Check additional effects. Assignment, notifications, external sending and recurrence should be deliberate, not extras added to a drafting request.
- Decide what success will look like. For task creation, it is one task in the correct Board with the intended fields. Completing the work inside that task is a later outcome.
- Correct the proposal before confirming if any of those details are wrong or unclear.
Give enough detail for useful work
For a practice review task, a complete instruction might be: “Review the welcome instruction: bring one sheet of paper and a pen; start by drawing Output, Owner and Check boxes. Confirm that the materials and all three labels are clear.”
“Bring the usual materials” is incomplete if the materials have not been defined. Ask for that detail rather than allowing a guessed list. Likewise, a proposal to create a Done task, assign the whole team and notify everyone is not equivalent to a request for a draft review task.
Check the saved result
After an action you intended to perform:
- Open the destination module through its normal navigation.
- Find the exact task or record. For a Board task, search the full title with Board scope, then confirm Task Title and Select board.
- Compare the description, status, date, responsibility and relevant links with your request.
- Check the real business outcome separately. A saved Backlog task records work to do; it does not prove that the review is complete. A sent-message entry does not prove that someone read it.
A generated “done” reply or success notification is useful feedback, but it does not replace checking the saved fields.
If the result is slow or unclear
Do not immediately repeat an action after a timeout. Search the destination and inspect the intended Board or list first. The change may already have been saved.
- Correct record found: Keep it; do not create another.
- Record found with wrong fields: Correct that record through the normal editing process.
- Outcome still unknown: Ask the responsible owner or support before retrying.
Switching to manual creation can also produce a duplicate. Board’s Create New → New Task → Create Task route is a separate workflow, not evidence that CoBrain created a task. Use Update Task to edit an existing task rather than creating a competing copy.
If CoBrain reports an error, keep the requested operation, source mode, time and exact error for support. Do not infer a billing, permission or permanent product problem from a generic message. Keep passwords and unrelated personal details out of the report.
Finish the course
Suppose an answer preserves the Friday deadline but changes “needs review” to “approved,” invents an owner and proposes a Done task. Correct the unsupported status and owner before taking action. If a previously approved save then times out, check the destination before retrying.
You are ready to use CoBrain in daily work when you can choose the right source, check the full answer, review a proposed change and confirm its actual result.
Turn what you learned into the way the team works.
Mark this lesson complete once the workflow exists in your workspace—not simply when you reach the bottom.